Structured cabling is the part of a Chicago law office build that nobody sees and everybody depends on. ClearMax technicians count the drops room by room from the architect's drawings, pull and terminate them while ceilings are open, label both ends to match the floor plan, and test every run before a single computer is plugged in. WiFi, the closet and the conference room screens are planned in the same pass, so the firm is not paying a second crew to open the ceiling again.
Last updated: November 2026
Counting drops before anything is quoted
The count comes from how each room is used, not from a standard number per desk. A typical law office plan covers:
- Partner and associate offices: a desk computer, a desk phone if the firm keeps them, and a spare for a second screen dock or a visiting laptop.
- Conference rooms: a table box, a drop behind the screen, one for the camera bar and one for a ceiling microphone if the firm wants room audio for calls.
- Reception: the check-in computer, the phone and a drop for the door controller nearby.
- Workroom and copier stations: one drop per copier, scanner and large-format printer, placed where the furniture plan actually puts them.
- Ceilings: one run per access point, placed from a coverage plan rather than spaced evenly.
- Doors and cameras: runs for each reader, lock power supply and camera, all returning to the closet.
Cable grade, labels and the test record
Most offices are wired with Category 6 cable; Category 6A is proposed where the firm wants headroom for faster access points or a long lease. Each jack carries a label matching a number on the as-built drawing and on its patch panel port. Every run is tested end to end with a cable tester that measures it against its category, and the results are saved into the handover binder alongside the drawing, so a future tenant improvement or a new hire's desk does not start with guesswork.
WiFi planned in the same pass
Access points go where people actually work and meet: conference rooms, the workroom, open associate areas and reception. The coverage plan accounts for glass walls, file shelving and the dense interior partitions common in law offices. Three networks are kept apart from day one:
- the firm network for staff computers, the server and the copiers;
- a device network for cameras, door controllers and building systems;
- a visitor network that reaches the internet and nothing inside the office.
Before handover a guest laptop is connected to the visitor network and used to try the server, the copiers and the camera recorder, so the firm sees for itself that none of them answer.
The network closet
The closet holds the rack, the patch panels, the switches, the firewall, a battery backup and, if the firm keeps one, the server. It needs dedicated power, cooling sized for what will run in it, and a door with a reader. Switch and firewall logs are kept so they can be read later. Illinois' Personal Information Protection Act, at 815 ILCS 530/10(a), requires breach notice in the most expedient time possible and without unreasonable delay, consistent with any measures necessary to determine the scope of the breach and restore the reasonable integrity, security, and confidentiality of the data system. The section applies to a breach of computerized data that includes personal information, which section 5 of the Act defines as a name combined with listed data elements such as a Social Security, driver's license or account number, or a user name or email address combined with a password, and readable logs from those systems are part of how a firm works out that scope.
City permits and building rules for low-voltage work
The Department of Buildings says that, except as it provides, a building permit is required for the installation of low voltage wiring, and its listed exception for that wiring is written for residential buildings up to 4 stories. The City's Express Permit Program has an Electrical Work category that covers installing, altering or removing low voltage systems, with Data/Video among the listed types, but that category is for stand-alone electrical work not associated with another building permit; when the office build runs under its own plan-based permit, the cabling belongs with that permit. The Department launched the Express Permit Program on November 6, 2023, replacing paper-based processes, so older move checklists that name the Easy Permit Process are out of date. The scope names any City permit the job needs and places it on the schedule.
Towers and older buildings
In a downtown tower, risers between floors belong to the building, so a firm taking a second floor needs management's approval for the pathway and the fiber or copper between closets. Ceiling work above occupied floors is often limited to evenings. In older buildings the ceiling may already be crowded with cable from earlier tenants; it is traced, and anything dead is removed with the landlord's agreement so the new runs are not buried in it. Plenum-rated cable is used wherever the drawings or the building call for it.
Cabling questions from Chicago firms
Can existing cable from the last tenant be reused?
Sometimes. It is tested first; runs that pass and land where the new plan needs them are kept, and the rest are pulled out.
Does the cabling crew also handle the electrical work?
No. Power for the closet and the outlets is the electrician's work under the build. The low-voltage scope is coordinated with it so the boxes and circuits are where the cable expects them.